HYPOBATT: Megawatt fast-charging demonstration project

Project overview
Electric ferries on frequent routes have a narrow window to recharge between sailings. HYPOBATT developed a modular ship-to-shore charging system to fit that window, using the Norddeich–Norderney ferry route in Germany as its test case. Coordinated by Ikerlan and co-funded by Horizon Europe, the project combined high-power charging with an automated connection designed to engage in under 30 seconds after safe mooring. It also explored using a digital twin to manage daily charger operations and adaptive charging to limit battery wear and reduce strain on the local grid.
The project tested both automatic and manual ship-to-shore connections at a pilot installation in Norddeich. At the final public demonstration on February 18, 2026, the consortium reported rapid automated connection and stable charging at up to 2 MW on a vessel operated by Reederei Norden-Frisia. The project closed on March 31, 2026.
Fundación Valenciaport examined how other ports could deploy the system, including technical feasibility, costs and potential business models. The trials also helped inform the draft IEC/IEEE 80005-4 standard for direct-current ship-to-shore connections. For ports planning electric ferry service, the demonstration offers a practical example of how charger power, connection time and vessel schedules can be addressed together.
Additional project information
Image gallery
Browse the images of this project.


Resources and relevant information
Project contact
Endika Bilbao | Ikerlan, HYPOBATT project coordinator
Email: ebilbao@ikerlan.es
Josep Sanz Argent | Fundación Valenciaport, Director of Energy Transition and Sustainability
Email: jsanz@fundacion.valenciaport.es
Explore more projects
Check out these related projects for more insight from port authorities around the world.
Subscribe to HACC news
Stay informed about our initiatives, upcoming events and blog posts.