A&P Falmouth shore power

Project overview
A&P Falmouth partnered with Marine Zero to design and install a scalable shore power system at its working shipyard in Cornwall, delivering the UK's first multi-vessel shore power hub on the Atlantic Peninsula. The project upgraded existing high-voltage substations and added 1.5 MVA shore power connections across multiple berths and dry docks. Marine Zero led engineering design and project management, integrating the equipment into existing shipyard operations and allowing for more capacity and connection points as demand grows.
The £12 million project received UK government funding through the Zero Emission Vessels and Infrastructure programme. On-site work began in October 2024, and Marine Zero lists completion and commissioning in Q2 2025. By allowing multiple vessels to turn off onboard diesel generators while docked, the system is designed to reduce carbon dioxide, other air emissions and noise. Marine Zero identifies performance monitoring and potential expansion to more berths and larger vessels as next steps.
Image gallery
Browse the images of this project.
Resources and relevant information
Project contact
A&P Falmouth general enquiries · info@apclgroup.co.uk · +44 1326 212100
Marine Zero · info@marinezero.com
Explore more projects
Check out these related projects for more insight from port authorities around the world.
Subscribe to HACC news
Stay informed about our initiatives, upcoming events and blog posts.








