Project overview

A&P Falmouth partnered with Marine Zero to design and install a scalable shore power system at its working shipyard in Cornwall, delivering the UK's first multi-vessel shore power hub on the Atlantic Peninsula. The project upgraded existing high-voltage substations and added 1.5 MVA shore power connections across multiple berths and dry docks. Marine Zero led engineering design and project management, integrating the equipment into existing shipyard operations and allowing for more capacity and connection points as demand grows.

The £12 million project received UK government funding through the Zero Emission Vessels and Infrastructure programme. On-site work began in October 2024, and Marine Zero lists completion and commissioning in Q2 2025. By allowing multiple vessels to turn off onboard diesel generators while docked, the system is designed to reduce carbon dioxide, other air emissions and noise. Marine Zero identifies performance monitoring and potential expansion to more berths and larger vessels as next steps.

Resources and relevant information

No items found.

Project contact

A&P Falmouth general enquiries · info@apclgroup.co.uk · +44 1326 212100

Marine Zero · info@marinezero.com

Related projects

Explore more projects

Check out these related projects for more insight from port authorities around the world.

Category
5 min read

Blog title heading will go here

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros.

Subscribe to HACC news

Stay informed about our initiatives, upcoming events and blog posts.

Join the mailing list